Earlier this year I reviewed a permit correction for a homeowner who’d converted a garage to a guest room five years prior — no permit, and the work included framing, electrical, and HVAC. Clark County required three things to start: a set of as-built drawings, a structural narrative, and a licensed contractor of record submitting on the homeowner’s behalf.
An as-built submittal is a set of drawings prepared after construction that documents exactly what was built — not the original blueprints, but a picture of what exists now, drawn to current code and run through formal plan check. Clark County requires those plans reviewed and approved before unpermitted work can be added to the property’s record.
In that case the homeowner needed one wall opened to confirm insulation and electrical rough-in met current code. One wall — far less invasive than they expected, because the original work was actually done reasonably well. The full correction took about six weeks from first site visit to Certificate of Completion, and the homeowner closed a refinance two months later.
That’s the pattern on most corrections we handle — the work often holds up fine; what’s missing is the record. Filing as the contractor of record under License #0090486, we turn an absent permit history into a documented, inspected, closed-out improvement.
Founder, 1 Home Construction LLC