Pricing and timeline can vary based on site complexity, material costs, and total scope. Site complexity includes demolition, soil correction, drainage improvements, and access limitations. Material costs fluctuate depending on paver thickness, color blends, border accents, and polymeric sand or sealers. Total scope covers square footage, curves, steps, retaining walls, and integrated features like lighting. Timelines may range from 3 to 7 working days for standard patios, but larger or phased projects could extend longer. These figures are preliminary benchmarks for informational purposes only and do not constitute a binding quote. An on-site evaluation is required for a final proposal.