A Sequenced Project

A Custom Las Vegas Home Build Has Eight Distinct Phases

A ground-up custom home in Las Vegas is a sequenced project with eight defined phases — not a single contract.

Those phases are lot evaluation, architect coordination, structural engineering, Clark County permit submission, foundation, framing and rough-in, finishes, and certificate of occupancy. Each depends on the one before it — skipping a step, or assigning it to someone who isn’t coordinating the full scope, creates gaps the project pays for later.

Start With the Lot

The lot determines more of your budget than the floor plan. Clark County setbacks, height restrictions, utility easements, and grading requirements vary by parcel, and a lot that looks buildable from the curb may need significant site work first. Every build here begins with the lot. Not the design. The lot.

Budget Reality

The Lot Determines More of Your Budget Than the Floor Plan

Setback rules, height limits, utility easements, and grading triggers all vary by parcel. We establish what the land actually costs to build on — not just what you paid for it — before an architect is engaged, which is the difference between a budget that holds and one that shifts mid-project.

Lot Before Architect

Why Lot Evaluation Comes Before Architect Coordination in Clark County

Lot evaluation — a pre-design site assessment reviewing zoning, easements, utilities, and grading — is the first step on every custom build we take.

From the Founder

Isaac Itzhaki founded 1 Home Construction in 2004. In over 20 years of building across Clark County, the same situation appears regularly: a homeowner buys a parcel, commissions drawings, and submits for plan check — only to discover the lot needs a Clark County grading permit, a utility extension, or a setback variance that changes the footprint entirely.

That discovery happens after the architect has been paid and the engineer has stamped the drawings. Redesign at that stage costs real money.

Our lot evaluation comes before any of that. We review the parcel’s zoning designation, recorded easements, utility connection points, and grading conditions, so the homeowner gets a clear picture of what the land actually costs to build on. That’s where a budget that holds is established.

Lots Are Not Created Equal

Summerlin parcels often carry HOA and CC&R overlays on top of county setbacks. Infill parcels in older neighborhoods may have utility easements that limit usable footprint. Raw land in the outer valley may require a utility extension as part of the scope. The lot evaluation accounts for all of it.

Isaac Itzhaki

Founder, 1 Home Construction LLC

Before Design Begins

What We Find When We Evaluate a Las Vegas Lot Before Design Begins

Every evaluation produces the same output: a confirmed picture of what can be built, what site prep will cost, and what the architect needs before drawing a line.

Some lots are clean — utilities at the street, flat grade, no easements through the buildable area. Those builds start faster and the budget is predictable from the first conversation. Others require more preparation: lots in the northwest valley sometimes have caliche close to the surface, which affects footing depth and excavation cost — see our full explanation of how caliche impacts Las Vegas construction. That isn’t visible from the street when the lot is purchased.

Infill lots in established Henderson neighborhoods sometimes have recorded easements cutting directly through the area a homeowner planned for a garage — which changes the entire floor plan. An architect hired before that easement was identified would be redrawing from scratch.

What the evaluation checks:

No Handoffs

One Crew From Lot Evaluation to Certificate of Occupancy

The structural engineer sizes the foundation and beam schedule; our crew builds it. The architect draws the framing plan; our crew frames to it. When the GC and the crew are the same entity start to finish, there are no handoffs where coordination breaks down — and a project manager is on-site for every inspection milestone.

Built In-House

Your Custom Home Is Built by the Same 25-Person Crew, Start to Finish

1 Home Construction’s 25 in-house crew members execute every phase under General Construction License #0090486.

Custom home construction involves architect coordination — working between the licensed architect who stamps and seals the structural drawings and the GC who executes the build. In Nevada, architectural drawings are required for new-home permit submissions. When the crew is the same from lot evaluation through certificate of occupancy, every phase carries forward without a coordination gap.

A production builder constructs homes from a fixed set of pre-designed floor plans because volume requires standardization. We design and construct each home to the client’s specific program, lot conditions, and material choices — no template applied, full stucco coverage with proper cure time, and every phase inspected before the next begins.

Our Build Process

Our Ground-Up Build Process for Clark County Custom Homes

Every custom home follows the same sequence — because Clark County requires it and quality demands it.

01

Lot Evaluation

Parcel review covering zoning, easements, grading triggers, and utility access before any design work begins.

02

Architect Coordination

Structural drawings prepared by a licensed architect to Clark County submission standards; we coordinate review and clarify field conditions.

03

Structural Engineering

Foundation type, beam sizing, and shear-wall placement designed to Clark County seismic and wind-load requirements.

04

Permit Submission

Full plan check package submitted to the Clark County Building Department — we are the licensed contractor of record.

05

Foundation

Footings, stem walls, or slab-on-grade per the engineered plan, with inspection before framing begins.

06

Framing and Rough-In

Structural framing, then mechanical, electrical, and plumbing rough-in — each inspected in sequence before walls close.

07

Finishes

Insulation, drywall, interior finishes, exterior stucco, roofing, and fixtures, executed by the same in-house crew.

08

Certificate of Occupancy

Final inspections across all trades, close-out documentation, and CO issuance from Clark County.

Finished In-House

The Same Crew That Frames Applies the Stucco

Insulation, drywall, interior finishes, full-coverage exterior stucco, roofing, and fixtures are all completed by the crew that’s been on the lot since foundation — no trade handoffs between phases, full stucco coats with proper cure time, and the project isn’t complete until the certificate of occupancy is in hand.

Every Milestone Explained

Foundation Through Certificate of Occupancy

Build-phase milestones — defined checkpoints where inspections are scheduled and client reviews occur — keep a custom build on a predictable timeline.

Lot Evaluation and Design Coordination

The lot evaluation produces a confirmed site brief that goes to the architect, with structural engineering following. We coordinate between architect and engineer to resolve any field condition affecting the stamped drawings before the permit package is assembled. Clark County’s plan check for new residential construction reviews structural calculations, energy compliance, and the site plan — and a complete submission starts the review clock.

Foundation and Framing

Foundation work begins after the grading permit clears and site prep is complete. Footing inspection happens before any concrete is poured; framing inspection happens before any rough mechanical work begins. Clark County inspectors confirm each phase before the next is authorized, and our project manager schedules every inspection and is on-site for each one.

Rough-In and Inspections

Mechanical, electrical, and plumbing are installed inside walls and floors and inspected while still visible — every circuit, every duct, every drain line. The rough-in inspection must pass before insulation goes in and drywall goes up, and our sequencing keeps each phase inspection-ready before the next trade mobilizes.

Finishes Through Certificate of Occupancy

Interior and exterior finishes follow insulation and drywall. The same crew that framed the house applies stucco, installs flooring, and completes finish carpentry — no trade handoffs. The certificate of occupancy is issued after all final inspections pass, confirming the home is legally habitable. We consider a project complete when the CO is in hand.

Service Area

Where Each Custom Home Build Starts: Lot Conditions by Area of Clark County

1 Home Construction builds custom homes across the full Clark County valley — and lot conditions vary meaningfully by location.

Master-planned lots in Summerlin (89134, 89135) and Henderson’s Green Valley Ranch (89052) carry HOA and CC&R overlays that narrow floor-plan options before the architect begins. Infill parcels in central Las Vegas, including the Downtown Arts District corridor (89101, 89102), often have recorded utility easements that reduce buildable area. Raw land in the outer northwest valley and along the I-215 corridor may require utility extension as a budget line item. Our southwest-valley office keeps us centrally positioned for daily site visits.

Las Vegas
Summerlin
Henderson
Green Valley Ranch
Downtown Arts District
Northwest Valley
I-215 Corridor
Spring Valley
Enterprise
Centennial Hills

Tell Us About Your Lot and Let's Start the Evaluation

The right starting point for a custom home in Las Vegas is the lot — not the floor plan. Tell us where your parcel is and we’ll review the zoning, pull the easement record, and identify the site conditions that affect your design and budget before you spend money on drawings.

Email of****@***************on.com  ·  5875 S Rainbow Blvd #204, Las Vegas, NV 89118  ·  License #0090486

FAQ

Custom Home Build Questions From Las Vegas Homeowners

Because the lot determines more of your budget than the design does. Clark County setback rules, height restrictions, utility easements, and grading requirements vary by parcel, and a lot that looks buildable from the curb may need significant site work before a foundation is poured. We evaluate zoning, easements, utilities, and grading first so the budget holds and the architect draws within real constraints.

A grading permit is a separate Clark County permit required before earthwork begins when soil is moved above a specified volume threshold. Lots with significant slope, fill, or excavation needs often trigger it, and foundation work can’t start until it clears. We identify whether your parcel triggers a grading permit during the lot evaluation, before design begins.

A production builder constructs homes from a fixed set of pre-designed floor plans because volume requires standardization. We design and construct each home to your specific program, lot conditions, and material choices, with our own 25-person in-house crew executing every phase from foundation to certificate of occupancy under General Construction License #0090486. No template is applied.

Nevada requires stamped architectural drawings for new-home permit submissions. We coordinate between the licensed architect who seals the drawings and the engineer who sizes the foundation and beam schedule, resolving field conditions before the permit package is assembled. Our crew then builds to those stamped plans, and our project manager schedules and attends every Clark County inspection.

Caliche is a hardened, calcium-rich soil layer common in parts of the northwest valley that can sit close to the surface and affect footing depth and excavation cost. It isn’t visible from the street when a lot is purchased, so we check for it during the lot evaluation. You can read our full explanation of how caliche and the desert climate affect Las Vegas construction.