General Contractor Summerlin | 1 Home Construction LLC
General Contractor · Summerlin, Las Vegas

General Contractor Serving Summerlin, Las Vegas


Summerlin projects have a step most of the valley doesn't: architectural review. Before a permit application is worth filing, your plans generally need sign-off from the Summerlin Community Association or your village's own sub-association, and that review governs exterior finishes, roof materials, paint colors, wall heights and often landscaping. Plan for it from the start and it costs you weeks. Discover it after design is finished and it costs you a redraw. We design around it from the first sketch.

  • NV License #0090486
  • Four Nevada Licenses
  • Building Since 2004
  • In-House Crews
What We Build

Services in Summerlin


Whole Home Remodels

Summerlin's older villages date to the early 1990s, so the homes are structurally sound but the systems are three decades old: original 100-amp panels that won't carry an induction range and a heat pump, water heaters at end of life, and polybutylene in some of the earliest builds. We assess those before drawing plans, because finding a panel upgrade mid-remodel is what converts a fixed bid into change orders. Interior work rarely needs architectural review, which makes it the fastest category to start.

Room Additions and Casitas

Additions in Summerlin run through two approvals rather than one. Architectural review looks at massing, rooflines, stucco and tile match, and whether the addition reads as original. The city looks at setbacks, lot coverage and structure. Casitas are common here and are usually the cleaner path where lot coverage allows, since a detached structure is easier to match visually than a bolted-on wing. Room addition cost guide.

ADUs and Garage Conversions

ADU feasibility in Summerlin depends on your village and your CC&Rs as much as on zoning, and some associations restrict separate entrances or rental use regardless of what the code permits. We read your CC&Rs before quoting rather than after, because an ADU that clears zoning and fails architectural review has still cost you design fees. Where it works, garage conversions and detached units both do. ADU pricing guide.

Outdoor Living and Pools

Backyards are where Summerlin's review process bites hardest: wall heights, shade structure materials, exterior lighting and anything visible above the wall line. Covered patios need engineered plans and permits. Pools add SNWA water-efficiency requirements on top of the county and association review. We handle the submittals together rather than sequentially, which is usually what keeps a summer project from becoming an autumn one.

Why Local Matters

Why Sequencing Matters More Here


Most of what goes wrong in Summerlin isn't construction, it's sequencing. A contractor who hasn't worked here treats architectural review as a formality at the end and loses six weeks when the association asks for a different roof tile. The order that works is: read the CC&Rs, design to them, submit for architectural review, then file with the city once approval is in hand.

We've been building under Clark County and City of Las Vegas rules since 2004, under NSCB #0090486, and we hold four active Nevada licenses covering general contracting, flooring, tile and painting. Those trades are our employees rather than subcontractors, which matters on a Summerlin schedule because the finish work is usually where timelines slip and we're not waiting on someone else's calendar to fix it.

Interior remodel with new flooring, paint and trim in a Las Vegas area home
Planning Realities

What Shapes a Summerlin Project


Architectural review comes first

The Summerlin Community Association and village sub-associations review exterior changes before the city ever sees your plans. Scope varies by village, but paint colors, roof tile, stucco texture, wall heights, shade structures and exterior lighting are commonly covered. Submission requirements and meeting schedules differ between associations, so the realistic advice is to confirm your specific village's process before committing to a start date. Interior-only work usually bypasses this entirely.

Two jurisdictions, depending on where you are

Summerlin straddles City of Las Vegas and unincorporated Clark County. Which one you fall under determines where plans are filed, what the fees are, and how inspections are scheduled. It is not always obvious from the address. We confirm jurisdiction by parcel before quoting, because filing with the wrong authority costs weeks and the correction is not quick.

Matching the original build

Because associations review whether an addition reads as original, material matching is a real constraint rather than an aesthetic preference. Roof tile profiles from the early 1990s are frequently discontinued, and stucco texture matching on a thirty-year-old elevation is skilled work. Sourcing these takes lead time. It is worth identifying the match requirement during design rather than discovering it at review.

Systems in the older villages

Homes in the first Summerlin villages are approaching thirty-five years old. Electrical panels sized for 1990s loads, aging water heaters, original HVAC and in the earliest builds polybutylene supply lines all show up regularly. None of it is unusual and all of it is solvable, but it needs to be in the scope and the budget from the beginning rather than surfacing as a change order in week three.

Heat, UV and material specification

Summerlin sits at the valley's western edge with full western sun exposure. Exterior paint, sealants, roofing and window components degrade faster here than specifications written for milder climates assume, so products need genuine UV and thermal-cycling ratings. Summer heat also compresses working hours on exterior scopes, and concrete pours follow hot-weather protocols. We build both into the schedule rather than explaining them afterward.

How We Work

Trusted Across Summerlin


Our Summerlin work comes largely through referral, which in a community this connected means the last project has to have gone well for the next one to exist. What clients mention afterward tends to be unglamorous: the crew was the same people throughout, the schedule held, and the architectural review paperwork was handled rather than handed back to them. Twenty years of filing under our own license means the permitting side is routine for us, which is the point of hiring someone who works here regularly.

Custom covered outdoor patio with shade structure at a Las Vegas area residence
Common Questions

Summerlin Project FAQs


Do I need Summerlin architectural approval for my remodel?

For exterior changes, almost certainly. The Summerlin Community Association and your village sub-association review things like paint colors, roof materials, stucco, wall heights, shade structures and exterior lighting. Interior-only remodels generally don't require it. Requirements and meeting schedules vary by village, so confirm your specific association's process early. We prepare the submittal documentation as part of the project.

Is Summerlin under City of Las Vegas or Clark County?

Both, depending on the parcel. Summerlin spans the city boundary and unincorporated county, and the address alone doesn't reliably tell you which. That determines where plans are filed, what fees apply and how inspections are scheduled. We verify jurisdiction by parcel before quoting, since filing with the wrong authority is a costly and slow mistake to unwind.

How long does architectural review add to a project?

It varies by association and by how complete your submittal is. Associations meet on their own schedules, and an incomplete package means waiting for the next cycle. The way to keep it short is designing to the guidelines from the start, so review confirms rather than corrects. We build a realistic allowance into the schedule instead of quoting a date that assumes instant approval.

Can I build an ADU in Summerlin?

It depends on your village and your CC&Rs, not just on zoning. Some associations restrict separate entrances or rental use even where county or city code would permit an ADU. We read your CC&Rs and confirm the zoning before quoting, because finding out at architectural review means you've already paid for design work that can't be built.

Why do older Summerlin homes need electrical upgrades?

The earliest villages date to the early 1990s, when 100-amp service was standard. Modern loads — induction cooking, EV charging, upgraded HVAC, a casita — often exceed what that panel can carry. It's a common finding rather than a problem with the house, but it belongs in the scope and budget from the outset rather than appearing as a change order.

Do you handle permits and inspections?

Yes. We file as contractor of record under NSCB #0090486, with whichever jurisdiction your parcel falls under, and we schedule inspections and handle plan check corrections. Filing under our license means the permitting authority holds us accountable for the work rather than leaving you to answer for it, which is not the case with an owner-builder permit.

How do you match existing roof tile and stucco?

Roof tile profiles from the early 1990s are often discontinued, so matching can mean sourcing salvage, finding a current equivalent that passes review, or relocating original tile to the visible elevation and using the closest match where it shows least. Stucco texture matching on an aged elevation is skilled work. We identify what's required during design, because lead times on discontinued materials are the thing that delays additions.

What does a Summerlin remodel cost?

Too dependent on scope, finish level and what the existing systems need for a useful number here. What we can say is that Summerlin projects carry two cost factors many valley projects don't: material matching driven by architectural review, and systems upgrades in the older villages. Our cost guides give valley-wide ranges, and we give you a real number after seeing the property.

Next Step

Start Your Summerlin Project


Tell us what you're planning and we'll walk the property, confirm which jurisdiction your parcel falls under, review your CC&Rs against the scope, and give you a schedule that accounts for architectural review rather than ignoring it. The visit is free. If what you want isn't going to clear review as designed, we'd rather say so before you've paid for drawings.