Building Safety reviews Eldorado plans for more than the layout. For additions and exterior structures, two items regularly change the scope: the soil under new foundations and the structural design of anything built outdoors.
The city’s geotechnical requirements call for recommendations on caliche removal and footing preparation when those soils are encountered. For a new slab or foundation, we account for the required soil information before settling the excavation scope. Applicable recommendations can change excavation methods and the foundation work included in the estimate.
The city also lists a residential wind design criterion of 115 MPH, Exposure B or C. For covered patios and other exterior structures, we confirm the applicable exposure during design. Together, these review requirements put ground preparation and structural connections into the scope before we set the construction sequence and price.



