What should the update say about permits and written changes?
The update should name the applicable permitting authority, the current permit or inspection stage, and any hold affecting the next activity. A permit application, an issued permit, and a completed inspection are different statuses. Ask which applies to the work being discussed.
Under Nevada’s residential improvement contract requirements, NRS 624.970 requires written project and payment information, accepted written changes, and contractor responsibility for necessary permits for covered owner-occupied single-family residential-improvement contracts. These requirements took effect October 1, 2023. A progress message should point to the accepted written change rather than substitute for it.
Permit requirements need to be checked against the actual scope and property. Our home remodeling permit guide provides background; the project update should report the actual status. Where plumbing or electrical work is involved, Nevada requires the applicable classification for self-performance. A general contracting license alone does not authorize that work.
If work is waiting on an inspection or correction, the report should identify the affected task and what must happen to release it. Do not treat a requested inspection as a passed inspection or an unresolved hold as a confirmed restart date.